Single project timeline

Roof Replacement Under Solar in Chicago Ridge, IL

Removal, the new roof and the reinstall sequenced together, so each phase starts when the last one ends.

Old cracked hexagonal asphalt shingles with bits of wood debris

Sequence Is Everything on a Solar Reroof

Replacing a roof that carries solar is a project with dependencies. The array has to come off before tear-off. The roof has to be complete before the mounts go in. The mounts have to be flashed before the modules go back. Get the order wrong, or leave gaps between the steps, and the costs show up later as downtime, leaks or a system that never quite recovers. We plan the whole thing as a single coordinated project. On the first call we map the phases: documentation and shutdown, removal and storage, the roof replacement on an open deck, new mounts and flashing, reinstall and recommissioning. Each phase gets a date, and each date is tied to the one before it. You have one contact for the solar side and a roofing schedule built around it. That matters on Chicago Ridge homes, where low-pitch ranches and split-levels often carry long rows of modules that take real time to remove and reinstall correctly. The result you are after is straightforward: a new roof that stays dry at every attachment point and a solar system that is producing at its old level, delivered without you managing two trades.

Phases Covered in the Project

One plan from first look to final output check.

  • Project timeline

    Removal, reroof and reinstall dates set as a linked sequence.

  • Documentation and shutdown

    Baseline photos and readings, then a safe disconnect.

  • Removal and storage

    Modules, rails and conduit taken down, tagged and warehoused.

  • Reroof on an open deck

    The new roof installed with nothing in the way.

  • Attachment points

    New mounts placed for the array's original layout.

  • Flashing and sealing

    Every mount and conduit penetration flashed into the new roof.

  • Reinstall

    Modules back in their mapped positions and reconnected.

  • Recommissioning

    Output compared to baseline and monitoring restored.

Project Flow From Plan to Power

  1. Plan the phases

    We review the roof, the array and your target dates, then inspect. The solar quote arrives itemized, usually within 48 hours, with the phase plan attached.

  2. Remove and reroof

    The array is documented, disconnected and stored. The roof is replaced, and new mounts and flashing go in once it is complete.

  3. Reinstall and verify

    Modules go back to their mapped spots, the system is recommissioned and output is checked. You receive the before-and-after records.

Why Owners Run It as One Project

  • One contact for the solar

    No passing notes back and forth between two trades.

  • Linked dates

    Each phase starts off the last one, which keeps system downtime short.

  • Attention at the attachments

    The penetrations through the new roof get the closest inspection on the job.

  • Linked timeline
  • Open deck
  • Flashed attachments
  • Production confirmed